Page 84 - LIT-18626-11-73
P. 84
UF3J14E0.book Page 79 Friday, June 23, 2017 9:47 AM
Pre-operation checks
flood the engine compartment and cause EJU40146
Post-launch checks
the watercraft to submerge. [ECJ00363]
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
2 (1) Launch the watercraft. (See page 82 for
1 information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
EJU41811
Cooling water pilot outlet check
1 Stern drain plug Make sure that water is discharged from the
2 O-ring
port (left) cooling water pilot outlet while the
Securely install the stern drain plugs by tight- engine is running. (See page 35 for informa-
ening them until they stop. tion on the cooling water pilot outlets.)
1
1 Stern drain plug EJU32715
Multifunction information center check
EJU41441
Hood check Make sure that the multifunction information
Push down on the rear of the hood and make center operates properly. (See page 44 for in-
sure that it is securely closed.
79

