Page 76 - LIT-18626-12-11
P. 76
UF3X10E0.book Page 71 Tuesday, August 7, 2018 2:42 PM
Pre-operation checks
ITEM ROUTINE PAGE
Jet thrust nozzle and re- Check the jet thrust nozzle and reverse gate for 78
verse gate damage.
Check the stern drain plugs for damage and foreign
Stern drain plugs 78
material and check that they are securely installed.
Hood Check that the hood is securely closed. 78
Front and rear seats Check that the seats are securely installed. 55
POST-LAUNCH CHECKS
Check that water is discharged from the port (left)
Cooling water pilot outlet cooling water pilot outlet while the engine is run- 78
ning.
Multifunction information Check the multifunction information center for prop- 79
center er operation.
Shift system Check the shift system for proper operation. 79
Engine idling speed Check the engine idling speed. 79
TIP:
To ensure safety and reliability, pre-operation checks should be made each time the water-
craft is used.
71

