Page 75 - LIT-18626-12-12
P. 75
UF3P12E0.book Page 70 Monday, July 23, 2018 9:51 AM
Pre-operation checks
Securely install the stern drain plugs by tight- EJU41811
Cooling water pilot outlet check
ening them until they stop.
Make sure that water is discharged from the
port (left) cooling water pilot outlet while the
engine is running. (See page 35 for informa-
tion on the cooling water pilot outlets.)
1
1 Stern drain plug
EJU43810
Hood check
Push down the hood latch and make sure
that it is securely closed. EJU32715
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 43 for in-
formation on proper operation of the multi-
function information center.)
EJU40146
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks: EJU43392
Shift system check
(1) Launch the watercraft. (See page 73 for
Operate the throttle lever and RiDE lever, and
information on launching the watercraft.)
check that the watercraft moves or does not
(2) Perform the checks and make sure that
move according to the displayed shift indica-
there are no malfunctioning items or oth-
tor. (See page 37 for shift system operation
er problems.
procedures.) WARNING! To avoid colli-
sions, operate at safe speeds and keep a
70

