Page 63 - LIT-18626-12-16
P. 63

UF3Y12E0.book  Page 58  Friday, April 27, 2018  1:38 PM



                                                                Pre-operation checks


                                  ITEM                         ROUTINE                   PAGE
                         Hood                   Check that the hood is securely closed.   65
                         Seat                   Check that the seat is securely installed.  44
                         POST-LAUNCH CHECKS
                                                Check that water is discharged from the cooling
                         Cooling water pilot outlet                                       65
                                                water pilot outlet while the engine is running.
                         Multifunction information   Check the multifunction information center for prop-  65
                         center                 er operation.
                         Shift system (EX Deluxe)  Check the shift system for proper operation.  66
                         Engine idling speed    Check the engine idling speed.            66
                        TIP:
                        To ensure safety and reliability, pre-operation checks should be made each time the water-
                        craft is used.












































                                                                                               58
   58   59   60   61   62   63   64   65   66   67   68