Page 70 - LIT-18626-12-16
P. 70
UF3Y12E0.book Page 65 Friday, April 27, 2018 1:38 PM
Pre-operation checks
flood the engine compartment and cause EJU40146
Post-launch checks
the watercraft to submerge. [ECJ00363]
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 68 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
2 er problems.
EJU40553
1 Cooling water pilot outlet check
1 Stern drain plug Make sure that water is discharged from the
2 O-ring
cooling water pilot outlet while the engine is
Securely install the stern drain plugs by tight- running. (See page 33 for information on the
ening them until they stop. cooling water pilot outlet.)
1
1 Stern drain plug EJU32715
Multifunction information center check
EJU44640
Hood check Make sure that the multifunction information
Close the hood, hook the hood latches, and center operates properly. (See page 39 for in-
check that the hood is securely closed. formation on proper operation of the multi-
function information center.)
1
1 Hood latch
65

