Page 77 - LIT-18626-12-64
P. 77
UF4G14E0.book Page 71 Wednesday, July 10, 2019 11:14 AM
Pre-operation checks
Securely install the stern drain plugs by tight- EJU40553
Cooling water pilot outlet check
ening them until they stop.
Make sure that water is discharged from the
cooling water pilot outlet while the engine is
running. (See page 34 for information on the
cooling water pilot outlet.)
1
1 Stern drain plug
EJU43810
Hood check
Push down the hood latch and make sure
that it is securely closed. EJU32715
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 43 for in-
formation on proper operation of the multi-
function information center.)
EJU40146
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks: EJU43392
Shift system check (VX / VX Deluxe /
(1) Launch the watercraft. (See page 74 for
VX Cruiser / VX Limited)
information on launching the watercraft.)
Operate the throttle lever and RiDE lever, and
(2) Perform the checks and make sure that
check that the watercraft moves or does not
there are no malfunctioning items or oth-
move according to the displayed shift indica-
er problems.
tor. (See page 36 for shift system operation
procedures.) WARNING! To avoid colli-
sions, operate at safe speeds and keep a
71

