Page 83 - LIT-18626-12-86
P. 83
UF3V12E0.book Page 77 Wednesday, June 3, 2020 2:38 PM
Pre-operation checks
Securely install the stern drain plugs by tight- EJU40553
Cooling water pilot outlet check
ening them until they stop.
Make sure that water is discharged from the
cooling water pilot outlet while the engine is
running. (See page 34 for information on the
cooling water pilot outlet.)
1
1 Stern drain plug
EJU41441
Hood check
Push down on the rear of the hood and make
sure that it is securely closed. EJU45260
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 45 for in-
formation on proper operation of the multi-
function information center.)
EJU43392
Shift system check
Operate the throttle lever and RiDE lever, and
check that the watercraft moves or does not
move according to the displayed shift indica-
tor. (See page 35 for shift system operation
EJU40146 procedures.) WARNING! To avoid colli-
Post-launch checks sions, operate at safe speeds and keep a
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 80 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
77

