Page 74 - LIT-18626-12-90
P. 74

UF4P10E0.book  Page 68  Friday, July 31, 2020  8:50 AM



                        Pre-operation checks


                                  ITEM                         ROUTINE                   PAGE
                         Jet thrust nozzle and re-  Check the jet thrust nozzle and reverse gate for   74
                         verse gate             damage.
                                                Check the stern drain plugs for damage and foreign
                         Stern drain plugs                                                74
                                                material and check that they are securely installed.
                         Hood                   Check that the hood is securely closed.   74
                         Front and rear seats   Check that the seats are securely installed.  53
                         POST-LAUNCH CHECKS
                                                Check that water is discharged from the port (left)
                         Cooling water pilot outlet  cooling water pilot outlet while the engine is run-  74
                                                ning.
                         Multifunction information   Check the multifunction information center for prop-  75
                         center                 er operation.
                         Shift system           Check the shift system for proper operation.  75
                         Engine idling speed    Check the engine idling speed.            75

                        TIP:
                        To ensure safety and reliability, pre-operation checks should be made each time the water-
                        craft is used.






































                        68
   69   70   71   72   73   74   75   76   77   78   79