Page 74 - LIT-18626-12-91
P. 74
UF4M10E0.book Page 68 Tuesday, August 4, 2020 11:35 AM
Pre-operation checks
ITEM ROUTINE PAGE
Jet thrust nozzle and re- Check the jet thrust nozzle and reverse gate for 74
verse gate damage.
Check the stern drain plugs for damage and foreign
Stern drain plugs 74
material and check that they are securely installed.
Hood Check that the hood is securely closed. 74
Front and rear seats Check that the seats are securely installed. 53
POST-LAUNCH CHECKS
Check that water is discharged from the cooling
Cooling water pilot outlet 75
water pilot outlet while the engine is running.
Multifunction information Check the multifunction information center for prop- 75
center er operation.
Shift system Check the shift system for proper operation. 75
Engine idling speed Check the engine idling speed. 75
TIP:
To ensure safety and reliability, pre-operation checks should be made each time the water-
craft is used.
68

