Page 52 - LIT-18626-14-56
P. 52

UF4R13E0.book  Page 46  Friday, March 31, 2023  1:54 PM



                        Pre-operation checks

                        POST-LAUNCH CHECKS

                                  ITEM                         ROUTINE                   PAGE
                                                Check that water is discharged from the cooling
                         Cooling water pilot outlet                                       52
                                                water pilot outlet while the engine is running.
                                                When the engine is started, check that the meter
                         Meter                  lighting comes on for a few seconds and then goes   52
                                                off.
                        TIP
                        To ensure safety and reliability, pre-operation checks should be made each time the water-
                        craft is used.
















































                        46
   47   48   49   50   51   52   53   54   55   56   57