Page 52 - LIT-18626-14-56
P. 52
UF4R13E0.book Page 46 Friday, March 31, 2023 1:54 PM
Pre-operation checks
POST-LAUNCH CHECKS
ITEM ROUTINE PAGE
Check that water is discharged from the cooling
Cooling water pilot outlet 52
water pilot outlet while the engine is running.
When the engine is started, check that the meter
Meter lighting comes on for a few seconds and then goes 52
off.
TIP
To ensure safety and reliability, pre-operation checks should be made each time the water-
craft is used.
46