Page 107 - LIT-18626-14-58
P. 107
UF7K10E0.book Page 98 Thursday, July 13, 2023 5:40 PM
Pre-operation checks
1
1 Stern drain plug
EJU47001
Multifunction information center check
EJU41441
Hood check Make sure that the multifunction information
Push down on the rear of the hood and make center operates properly. (See page 46 for in-
sure that it is securely closed. formation on proper operation of the multi-
function information center.)
EJU43394
Shift system check
Operate the throttle lever and RiDE lever, and
check that the watercraft moves or does not
move according to the displayed shift indica-
tor. (See page 35 for shift system operation
procedures.) WARNING! To avoid colli-
sions, operate at safe speeds and keep a
safe distance away from people, objects,
and other watercraft. [EWJ01860]
EJU40147
Post-launch checks
Perform the post-launch checks in the pre-
F
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 101 for 2 km/h
information on launching the watercraft.) RPM E
3
(2) Perform the checks and make sure that 12.7v OFF PM
there are no malfunctioning items or oth- 4
er problems. 1
EJU40553 1 Shift indicator
Cooling water pilot outlet check 2 “F” (Forward position)
Make sure that water is discharged from the
3 “N” (Neutral position)
cooling water pilot outlet while the engine is
4 “R” (Reverse position)
running. (See page 33 for information on the
cooling water pilot outlet.)
98

