Page 67 - LIT-18626-13-99
P. 67
UF6C11E0.book Page 61 Tuesday, July 19, 2022 4:21 PM
Pre-operation checks
allowing water to enter the engine com-
partment. Check the O-rings on the stern
drain plugs and make sure that the plugs
are tightened securely before launching
the watercraft. Otherwise, water may
flood the engine compartment and cause 1
the watercraft to submerge. [ECJ00364]
1 Hood latch
EJU40147
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
2 the water and the engine is running.
1 To perform the post-launch checks:
1 Stern drain plug (1) Launch the watercraft. (See page 64 for
2 O-ring information on launching the watercraft.)
Securely install the stern drain plugs by tight- (2) Perform the checks and make sure that
ening them until they stop. there are no malfunctioning items or oth-
er problems.
EJU40553
Cooling water pilot outlet check
Make sure that water is discharged from the
cooling water pilot outlet while the engine is
running. (See page 31 for information on the
cooling water pilot outlet.)
1
1 Stern drain plug
EJU44640
Hood check
Close the hood, hook the hood latches, and
check that the hood is securely closed.
EJU32715
Multifunction information center check
Make sure that the multifunction information
center operates properly. (See page 37 for in-
61