Page 58 - LIT-18626-14-56
P. 58
UF4R13E0.book Page 52 Friday, March 31, 2023 1:54 PM
Pre-operation checks
1
1 Stern drain plug
EJU45840
Meter check
EJU40703
Hood check Make sure that the meter operates properly.
Make sure that the hood is securely closed. (See page 31 for information on proper oper-
(See page 34 for information on the hood.) ation of the meter.)
EJU40147
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 54 for
information on launching the watercraft.)
(2) Perform the checks and make sure that
there are no malfunctioning items or oth-
er problems.
EJU40553
Cooling water pilot outlet check
Make sure that water is discharged from the
cooling water pilot outlet while the engine is
running. (See page 29 for information on the
cooling water pilot outlet.)
52