Page 95 - LIT-18626-15-25
P. 95
UF4N14E0.book Page 84 Friday, May 24, 2024 8:56 AM
Pre-operation checks
EJU40147
Post-launch checks
Perform the post-launch checks in the pre-
operation checklist while the watercraft is in
the water and the engine is running.
To perform the post-launch checks:
(1) Launch the watercraft. (See page 87 for
2 information on launching the watercraft.)
(2) Perform the checks and make sure that
1
there are no malfunctioning items or oth-
1 Stern drain plug er problems.
2 O-ring EJU40553
Cooling water pilot outlet check
Securely install the stern drain plugs by tight-
Make sure that water is discharged from the
ening them until they stop.
cooling water pilot outlet while the engine is
running. (See page 33 for information on the
cooling water pilot outlet.)
1
1 Stern drain plug
EJU41441
Hood check
Push down on the rear of the hood and make EJU46240
Multifunction information center check
sure that it is securely closed.
Make sure that the multifunction information
center operates properly. (See page 44, 49
for information on proper operation of the
multifunction information center.)
EJU43394
Shift system check (VX / VX DELUXE /
VX CRUISER / VX LIMITED)
Operate the throttle lever and RiDE lever, and
check that the watercraft moves or does not
move according to the displayed shift indica-
tor. (See page 35 for shift system operation
procedures.) WARNING! To avoid colli-
sions, operate at safe speeds and keep a
84

